Services
We are a complete concrete service provider specializing in residential and commercial
projects for the General Contractor and Homeowner. Our services include but are
not limited to; commercial slabs, residential house slabs, footings, foundations,
reinforcement, retaining walls, decorative concrete, light excavation and grade
work.
Projects
Some of the projects we have been hired to complete for customers are listed below.
|
Projects
|
|
Project:
|
Biolife Plasma Service Center
|
Completed:
|
12/1/2007
|
|
General Contractor:
|
Hoffman, LLC.
|
Address:
|
816 North 2860 East
|
|
Contact:
|
Rob Ashley 920-731-2322
|
|
St.George, UT 84790
|
|
Biolife Plasma Service Center is a plasma donation center located west of Costco and serving all of Southern Utah. The project consisted of approximately 15,000 square feet of slab on grade poured on an early St.George August morning. We used a laser screed to exceed the Ff and Fl requirements of Ff 35 and Fl 25 on the floors and freezer pads. The site concrete was also contracted to us; it included over 32,000 square feet of 6” thick concrete parking lot pavement. We had to overcome challenges of extremely tight access and traffic as well as an aggressive schedule during this portion of the contract. The overall contract amount was $280,000 and consisted of a 4 week schedule for the footings, stem wall and slab and an 8 week schedule for the parking pavement.
|
|
|
|
|
Project:
|
America First Federal Credit Union
|
Completed:
|
5/1/2008
|
|
General Contractor:
|
Jacobsen Construction
|
Address:
|
1456 West Sunset Blvd
|
|
Contact:
|
Jay Sarten 702-496-0795
|
|
St.George, UT 84770
|
|
The AFFCU St.George, UT branch is located on the Corner of Sunset Blvd and Westridge Dr. This Project consisted of approximately 5,000 square feet of slab on grade, 4 drive-thru islands with 48 pipe bollards, 1,100 linear feet of curb and gutter. This project although small in comparison to others was really a challenging project to complete. It had some specific areas of emphasis for flatness with low tolerances for conduit to sit on top of the floor in a grid/tile system. We are currently on our way to completing this project within the allotted time frame.
|
|
|
|
|
Project:
|
Green Valley LDS 3rd Ward
|
Completed:
|
10/1/2007
|
|
General Contractor:
|
Valley Builders
|
Address:
|
1282 West 500 South Cir.
|
|
Contact:
|
Steve Anderson 801-641-3598
|
|
St.George, UT 84770
|
|
The Green Valley 3rd Ward project was a standard Heritage Chapel with approximately 16,500 square feet of slab on grade flatwork with a portion of that slab on grade depressed 2”. Approximately 3,100 linear feet of curb and gutter. The total project contract was $216,000 and it took approximately 5 months from start to finish of the site concrete. And about 4 months of our time collectively. The Ff and Fl requirements for any LDS chapel are Ff 28 and Fl 20 with a local value of Ff 20 and Fl 15. This project we exceeded these stringent requirements. We got an Ff 36.3 average. And an Fl 43.6 average. Copies of test results are available upon request.
|
|
|
|
|
Project:
|
Alvey Storage Units
|
Completed:
|
8/1/2006
|
|
General Contractor:
|
Thebeau Consulting
|
Address:
|
460 South 300 East
|
|
Contact:
|
Dan Thebeau 435-689-0155
|
|
Kanab, UT 84741
|
|
The Alvey Storage Unit Project consisted of approximately 16,800 square feet of 4” flatwork and 2,500’ of footings. This project is located in downtown Kanab, UT. And was particularly enjoyable for our Kanab operation to work on. The project contract amount was $111,000 and was completed in a timely manner of 6 weeks. At the time this was the largest revenue project we had ever completed.
|
|
|
|
|
Project:
|
Millcreek Warehouse
|
Completed:
|
12/1/2007
|
|
General Contractor:
|
RHC Construction, Inc.
|
Address:
|
3292 E. Deseret Dr.
|
|
Contact:
|
Rod Capson 435-680-1521
|
|
St.George, UT 84790
|
|
The Millcreek Warehouse project is located in the Millcreek Industrial Park, St.George, UT. And is a two level warehouse with loading dock, 15’ high walls, 10’x16” retaining wall footings, 6,200 square feet of lower level, 14,300 square feet of upper level and 25,600 square feet of 6” thick concrete parking lot pavement / loading dock. This project went very well and is a great accomplishment for Highstandard Concrete. Our contract amount for this project was $270,000 with out the walls. And we completed the foundation portion of this project in an 7 week period of time collectively.
|
|
|
|
|
Project:
|
Southwest Applied Tech. College
|
Completed:
|
2/1/2007
|
|
General Contractor:
|
Thebeau Consulting
|
Address:
|
733 S. Cowboy Way
|
|
Contact:
|
Dan Thebeau 435-689-0155
|
|
Kanab, UT 84741
|
|
The Southwest Applied Technical College located next to Kanab High School is a vocational college. The slab on grade consisted of approximately 14,000 square feet and roughly 800 linear feet of footings poured monolithically with the slab on grade. This project contract amount was $91,000 and was completed in approximately 6 weeks collectively. This project we feel went very smooth with little to no issues or problems.
|
|
|
|
|
Project:
|
Hurricane LDS 13th Ward
|
Completed:
|
6/1/2008
|
|
General Contractor:
|
Valley Builders
|
Address:
|
320 North 3400 West
|
|
Contact:
|
Steve Anderson 801-641-3598
|
|
Hurricane, UT 84737
|
|
The Hurricane 13th Ward project was a standard Heritage Chapel with approximately 16,500 square feet of slab on grade flatwork with approximately 2,810 linear feet of curb and gutter. The total project contract was $284,000 and we are on track to finish approximately 5 months from start of foundation to finishing the site concrete. And about 4 months of our time collectively. The Ff and Fl requirements for any LDS chapel are Ff 28 and Fl 20 with a local value of Ff 20 and Fl 15. This project we exceeded these stringent requirements. We got an Ff 28.0 average. And an Fl 25.2 average. Copies of test results are available upon request.
|
|
|
|
|
Project:
|
Morningside LDS 3rd, 5th & 9th Wards
|
Completed:
|
|
|
General Contractor:
|
Blackburn and Associates
|
Address:
|
1740 E. Foremaster Dr.
|
|
Contact:
|
Dave Holmes 435-586-5822
|
|
St.George, UT 84790
|
|
The Morningside LDS 3rd, 5th & 9th Wards project is a standard Heritage Chapel with approximately 16,500 square feet of slab on grade flatwork with approximately 3,100 linear feet of curb and gutter. The total project contract is $206,000 and we are on track to finish approximately 5 months from start of foundation to finishing the site concrete. And about 4 months of our time collectively. The Ff and Fl requirements for any LDS chapel are Ff 28 and Fl 20 with a local value of Ff 20 and Fl 15. On this project we look forward to exceeding these stringent requirements. This project is located on top of Foremaster Ridge in St.George, UT. Has a projected start date of May 2008.
|
|
|
|
|
Project:
|
Comstock Substation
|
Completed:
|
10/1/2007
|
|
General Contractor:
|
Codale Electric
|
Address:
|
Comstock Road
|
|
Contact:
|
Richard Evans 801-975-5556
|
|
Cedar City, UT 84720
|
|
The Comstock Substation is an electrical substation located about 20 miles west of Cedar City, UT at the Comstock Iron Mine. This project consisted of 8 concrete piers ranging in depths of 23’ to 6’ and diameters of 5’ to 3’, 1 transformer pad and collection tank, 1 breaker pad, control housing and a 16’ high shield wall. The views from this project were beautiful but the difficulties of a remote location were less than ordinary. The contract amount for this project was $170,000 and had a strict time frame due to the shipping of the electrical components to be set on their foundations upon arrival. We completed the foundation portion of the project in 4 weeks.
|
|
|
|
|
Project:
|
Washington Fields LDS 8th Ward
|
Completed:
|
3/1/2008
|
|
General Contractor:
|
Jacobsen Construction
|
Address:
|
750 South 3000 East
|
|
Contact:
|
Markel Massey 801-879-7654
|
|
St.George, UT 84790
|
|
The Washington Fields 8th Ward project was a standard Heritage Chapel with approximately 16,500 square feet of slab on grade flatwork with approximately 1,200 linear feet of curb and gutter. This project also consisted of an out of the ordinary item, an irrigation ditch. We used an irrigation ditch slip form boat that we pulled behind a blade to pour the 850’ of ditch. The total project contract was $258,000 and it took approximately 5 months from start to finish of the site concrete. And about 4 months of our time collectively. The Ff and Fl requirements for any LDS chapel are Ff 28 and Fl 20 with a local value of Ff 20 and Fl 15. This project we exceeded these stringent requirements. We got an Ff 30.7 average. And an Fl 41.9 average. Copies of test results are available upon request.
|
|
|
|
|
Project:
|
Green Spring Golf Course Cart Path
|
Completed:
|
2/1/2008
|
|
General Contractor:
|
City of Washington
|
Address:
|
588 N. Greenspring Dr.
|
|
Contact:
|
Jeff Stevenson 435-680-7044
|
|
Washington, UT 84780
|
|
The Green Spring Golf Course project for the City of Washington was an exceptional project that consisted of 51,000 square feet of 4” thick concrete golf cart path in various locations through the back nine holes of the course. Including all earthwork and grading for the cart path. We used motorized concrete buggies to keep within the instructions of no trucks on the course and to keep up with the time frame that the City wanted. Overall the project was completed in 4 weeks collectively and had a contract amount of $125,000.
|
|
|
|
|
Project:
|
Red Hawk Subdivision
|
Completed:
|
|
|
General Contractor:
|
Kier Construction Corp.
|
Address:
|
Springdale, UT
|
|
Contact:
|
Joe Torman 801-627-1414
|
|
|
|
This Red Hawk Subdivision is located in Downtown Springdale, UT close to Zion National Park. This project has particularly great views. This subdivision consists of 4 Apartment buildings with approximately 4,000 square feet each. Highstandard Concrete is only contracted to do the foundations and slab on grades. There is no site concrete in our contract. The estimated start date for the project is May 2008 and we are on track to be able to complete the foundations in less than 2 weeks each, pending plumbing and electrical. The total contract amount for this project is $131,000. We look forward to working amongst the beautiful scenery.
|
|
|
|
|
|