We are a complete concrete service provider specializing in residential and commercial projects for the General Contractor and Homeowner. Our services include but are not limited to; commercial slabs, residential house slabs, footings, foundations, reinforcement, retaining walls, decorative concrete, light excavation and grade work.


Projects

Some of the projects we have been hired to complete for customers are listed below.
Projects
Project: Biolife Plasma Service Center Completed: 12/1/2007
General Contractor: Hoffman, LLC. Address: 816 North 2860 East
Contact: Rob Ashley 920-731-2322 St.George, UT 84790
Biolife Plasma Service Center is a plasma donation center located west of Costco and serving all of Southern Utah. The project consisted of approximately 15,000 square feet of slab on grade poured on an early St.George August morning. We used a laser screed to exceed the Ff and Fl requirements of Ff 35 and Fl 25 on the floors and freezer pads. The site concrete was also contracted to us; it included over 32,000 square feet of 6” thick concrete parking lot pavement. We had to overcome challenges of extremely tight access and traffic as well as an aggressive schedule during this portion of the contract. The overall contract amount was $280,000 and consisted of a 4 week schedule for the footings, stem wall and slab and an 8 week schedule for the parking pavement.

Project: America First Federal Credit Union Completed: 5/1/2008
General Contractor: Jacobsen Construction Address: 1456 West Sunset Blvd
Contact: Jay Sarten 702-496-0795 St.George, UT 84770
The AFFCU St.George, UT branch is located on the Corner of Sunset Blvd and Westridge Dr. This Project consisted of approximately 5,000 square feet of slab on grade, 4 drive-thru islands with 48 pipe bollards, 1,100 linear feet of curb and gutter. This project although small in comparison to others was really a challenging project to complete. It had some specific areas of emphasis for flatness with low tolerances for conduit to sit on top of the floor in a grid/tile system. We are currently on our way to completing this project within the allotted time frame.

Project: Green Valley LDS 3rd Ward Completed: 10/1/2007
General Contractor: Valley Builders Address: 1282 West 500 South Cir.
Contact: Steve Anderson 801-641-3598 St.George, UT 84770
The Green Valley 3rd Ward project was a standard Heritage Chapel with approximately 16,500 square feet of slab on grade flatwork with a portion of that slab on grade depressed 2”. Approximately 3,100 linear feet of curb and gutter. The total project contract was $216,000 and it took approximately 5 months from start to finish of the site concrete. And about 4 months of our time collectively. The Ff and Fl requirements for any LDS chapel are Ff 28 and Fl 20 with a local value of Ff 20 and Fl 15. This project we exceeded these stringent requirements. We got an Ff 36.3 average. And an Fl 43.6 average. Copies of test results are available upon request.

Project: Alvey Storage Units Completed: 8/1/2006
General Contractor: Thebeau Consulting Address: 460 South 300 East
Contact: Dan Thebeau 435-689-0155 Kanab, UT 84741
The Alvey Storage Unit Project consisted of approximately 16,800 square feet of 4” flatwork and 2,500’ of footings. This project is located in downtown Kanab, UT. And was particularly enjoyable for our Kanab operation to work on. The project contract amount was $111,000 and was completed in a timely manner of 6 weeks. At the time this was the largest revenue project we had ever completed.

Project: Millcreek Warehouse Completed: 12/1/2007
General Contractor: RHC Construction, Inc. Address: 3292 E. Deseret Dr.
Contact: Rod Capson 435-680-1521 St.George, UT 84790
The Millcreek Warehouse project is located in the Millcreek Industrial Park, St.George, UT. And is a two level warehouse with loading dock, 15’ high walls, 10’x16” retaining wall footings, 6,200 square feet of lower level, 14,300 square feet of upper level and 25,600 square feet of 6” thick concrete parking lot pavement / loading dock. This project went very well and is a great accomplishment for Highstandard Concrete. Our contract amount for this project was $270,000 with out the walls. And we completed the foundation portion of this project in an 7 week period of time collectively.

Project: Southwest Applied Tech. College Completed: 2/1/2007
General Contractor: Thebeau Consulting Address: 733 S. Cowboy Way
Contact: Dan Thebeau 435-689-0155 Kanab, UT 84741
The Southwest Applied Technical College located next to Kanab High School is a vocational college. The slab on grade consisted of approximately 14,000 square feet and roughly 800 linear feet of footings poured monolithically with the slab on grade. This project contract amount was $91,000 and was completed in approximately 6 weeks collectively. This project we feel went very smooth with little to no issues or problems.

Project: Hurricane LDS 13th Ward Completed: 6/1/2008
General Contractor: Valley Builders Address: 320 North 3400 West
Contact: Steve Anderson 801-641-3598 Hurricane, UT 84737
The Hurricane 13th Ward project was a standard Heritage Chapel with approximately 16,500 square feet of slab on grade flatwork with approximately 2,810 linear feet of curb and gutter. The total project contract was $284,000 and we are on track to finish approximately 5 months from start of foundation to finishing the site concrete. And about 4 months of our time collectively. The Ff and Fl requirements for any LDS chapel are Ff 28 and Fl 20 with a local value of Ff 20 and Fl 15. This project we exceeded these stringent requirements. We got an Ff 28.0 average. And an Fl 25.2 average. Copies of test results are available upon request.

Project: Morningside LDS 3rd, 5th & 9th Wards Completed:
General Contractor: Blackburn and Associates Address: 1740 E. Foremaster Dr.
Contact: Dave Holmes 435-586-5822 St.George, UT 84790
The Morningside LDS 3rd, 5th & 9th Wards project is a standard Heritage Chapel with approximately 16,500 square feet of slab on grade flatwork with approximately 3,100 linear feet of curb and gutter. The total project contract is $206,000 and we are on track to finish approximately 5 months from start of foundation to finishing the site concrete. And about 4 months of our time collectively. The Ff and Fl requirements for any LDS chapel are Ff 28 and Fl 20 with a local value of Ff 20 and Fl 15. On this project we look forward to exceeding these stringent requirements. This project is located on top of Foremaster Ridge in St.George, UT. Has a projected start date of May 2008.

Project: Comstock Substation Completed: 10/1/2007
General Contractor: Codale Electric Address: Comstock Road
Contact: Richard Evans 801-975-5556 Cedar City, UT 84720
The Comstock Substation is an electrical substation located about 20 miles west of Cedar City, UT at the Comstock Iron Mine. This project consisted of 8 concrete piers ranging in depths of 23’ to 6’ and diameters of 5’ to 3’, 1 transformer pad and collection tank, 1 breaker pad, control housing and a 16’ high shield wall. The views from this project were beautiful but the difficulties of a remote location were less than ordinary. The contract amount for this project was $170,000 and had a strict time frame due to the shipping of the electrical components to be set on their foundations upon arrival. We completed the foundation portion of the project in 4 weeks.

Project: Washington Fields LDS 8th Ward Completed: 3/1/2008
General Contractor: Jacobsen Construction Address: 750 South 3000 East
Contact: Markel Massey 801-879-7654 St.George, UT 84790
The Washington Fields 8th Ward project was a standard Heritage Chapel with approximately 16,500 square feet of slab on grade flatwork with approximately 1,200 linear feet of curb and gutter. This project also consisted of an out of the ordinary item, an irrigation ditch. We used an irrigation ditch slip form boat that we pulled behind a blade to pour the 850’ of ditch. The total project contract was $258,000 and it took approximately 5 months from start to finish of the site concrete. And about 4 months of our time collectively. The Ff and Fl requirements for any LDS chapel are Ff 28 and Fl 20 with a local value of Ff 20 and Fl 15. This project we exceeded these stringent requirements. We got an Ff 30.7 average. And an Fl 41.9 average. Copies of test results are available upon request.

Project: Green Spring Golf Course Cart Path Completed: 2/1/2008
General Contractor: City of Washington Address: 588 N. Greenspring Dr.
Contact: Jeff Stevenson 435-680-7044 Washington, UT 84780
The Green Spring Golf Course project for the City of Washington was an exceptional project that consisted of 51,000 square feet of 4” thick concrete golf cart path in various locations through the back nine holes of the course. Including all earthwork and grading for the cart path. We used motorized concrete buggies to keep within the instructions of no trucks on the course and to keep up with the time frame that the City wanted. Overall the project was completed in 4 weeks collectively and had a contract amount of $125,000.

Project: Red Hawk Subdivision Completed:
General Contractor: Kier Construction Corp. Address: Springdale, UT
Contact: Joe Torman 801-627-1414
This Red Hawk Subdivision is located in Downtown Springdale, UT close to Zion National Park. This project has particularly great views. This subdivision consists of 4 Apartment buildings with approximately 4,000 square feet each. Highstandard Concrete is only contracted to do the foundations and slab on grades. There is no site concrete in our contract. The estimated start date for the project is May 2008 and we are on track to be able to complete the foundations in less than 2 weeks each, pending plumbing and electrical. The total contract amount for this project is $131,000. We look forward to working amongst the beautiful scenery.